| RESEARCH
CENTER, ZELZATE, GENT, B |
 |
Research
Centre, Zelzate, Gent, B
Architects
& Structural Engineers: Samyn & Associés,
Bruxelles. Completed 1991.
The
client's brief was to combine workshops, laboratories and
offices in buildings which were attractive and eye catching.
The designers took up this challenge and achieved a structure
of the highest quality in both design and
construction. Only steel could satisfy the needs of the
designers, incorporating curved and linear elements in such a
creative
form. |
| BATI
TOURISM CENTRE, Istanbul, TR |
 |
Bati
Tourism Centre, Istanbul, TR
Architect:
Oktay Nayman Structural Engineers: Erdemli Engineering and
Consultancy Ltd. Completed 1996.
The main
theme of the Bati park is 'entertainment in nature'. Being
indoors this piece of man-made nature needed a man-made sky -
a glazed vault. The main structural elements of this vault
were created as diagonal trusses with a geometrically uniform
rigidity. To achieve efficient fabrication and erection
through mass production these trusses had to be built from
standard segments of fixed depth. The result is an amazingly
light, elegant and economic structure with lazily twisting
arches. |
| EXHIBITION CENTRE,
CHALON-SUR-SAONE, F
|
 |
Architects:
Phillippe Houot, Saint-Dié. Completed 1992.
This
building, somewhat futuristic in style, was completed in just
five months. Within this timescale the complete structure,
which involved 275 tonnes of structural steelwork, was
designed, detailed and constructed.
|
| RADSSPORTHALLE, BERLIN, D
|
 |
Radsporthalle, Berlin, D
Architects:
Dominique Perault, Paris-Berlin Structural Engineers: Ove
Arup & Partners, London-Berlin. Completed
1997.
This
three-dimensional structure, built in a circle with a diameter
of 140 m, is one of the biggest free-span indoor sports arenas
in Europe. Due to a low fire load, big open compartment and
the height of the sportshall, no applied fire protection was
required for the steel structure. The whole structure was
painted to give corrosion protection guaranteed for 15 years.
The natural daylight plays lightly on the painted steel
structure and creates an internal environment of high
quality. |